Resource Type

Journal Article 143

Conference Videos 2

Conference Information 1

Year

2024 1

2023 5

2022 8

2021 9

2020 9

2019 6

2018 7

2017 10

2016 2

2015 3

2014 4

2013 11

2012 7

2011 11

2010 7

2009 7

2008 4

2007 8

2006 5

2005 3

open ︾

Keywords

Rock mechanics 3

Deep mining 2

bridges 2

carbonate rock 2

numerical simulation 2

rock 2

slope 2

stability 2

stress 2

tunnel boring machine 2

tunnels 2

1 D stress-waves 1

300 M steel 1

3D induced polarization 1

3D seismic method 1

In situstresses 1

AE location 1

Abnormal region identification 1

Adverse geology 1

open ︾

Search scope:

排序: Display mode:

The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction: Article

Shucai Li, Lichao Nie, Bin Liu

Engineering 2018, Volume 4, Issue 1,   Pages 131-137 doi: 10.1016/j.eng.2017.12.010

Abstract:

An increasing number of tunnels are being constructed with tunnel-boring machines (TBMs) due to theHowever, when a TBM encounters adverse geological conditions in the course of tunnel construction (e.gThis paper uses the TBM tunneling of the water conveyance project from Songhua River as a case studyorder to propose a comprehensive forward geological prospecting technical system that is suitable for TBMtunneling and for ensuring that a TBM can work efficiently.

Keywords: Hard rock TBM tunnels     Comprehensive forward prospecting     Geological analysis     3D induced polarization     3D    

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnel

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 4,   Pages 401-413 doi: 10.1007/s11709-022-0823-3

Abstract: Real-time dynamic adjustment of the tunnel bore machine (TBM) advance rate according to the rock-machineinteraction parameters is of great significance to the adaptability of TBM and its efficiency in constructionThis paper proposes a real-time predictive model of TBM advance rate using the temporal convolutionalnetwork (TCN), based on TBM construction big data.The penetration rate and cutterhead torque of the current moment have significant influence on the TBM

Keywords: hard rock tunnel     tunnel bore machine advance rate prediction     temporal convolutional networks     soft    

A Closer Look at the Design of Cutterheads for Hard Rock Tunnel-Boring Machines

Jamal Rostami, Soo-Ho Chang

Engineering 2017, Volume 3, Issue 6,   Pages 892-904 doi: 10.1016/j.eng.2017.12.009

Abstract:

The success of a tunnel-boring machine (TBM) in a given project depends on the functionality of allproprietary algorithms by the manufacturers, and despite recent attention on the subject, the design of rock

Keywords: TBM cutterhead design     Cutterhead layout     Disk cutters     Cutting pattern     TBM efficiency    

Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study

Frontiers of Structural and Civil Engineering doi: 10.1007/s11709-023-0984-8

Abstract: This paper presents a case study of the clogging of a slurry-shield tunnel-boring machine (TBM) experienceddue to special geological conditions, which had a considerably negative impact on the slurry-shield TBMIn this case study, the effect of clogging on the slurry-shield TBM tunneling performance (e.g., advance

Keywords: slurry-shield TBM     geological investigation     clogging     argillaceous siltstone     TBM performance     mitigation    

Field and laboratory experimental studies on hard-rock tunnel excavation based on disc cutter coupled

Frontiers of Structural and Civil Engineering   Pages 1370-1386 doi: 10.1007/s11709-023-0947-0

Abstract: The tunnel boring machine (TBM) is typically used in hard-rock tunnel excavation.Owing to the unsatisfactory adaptability of TBM to the surrounding rock, when crossing high-strengthTBM tunneling.nozzle diameter, and nozzle speed on cutting are investigated via laboratory experiments of cutting hardrock breaking.

Keywords: tunnel boring machine     hard-rock cutting     free face     disc cutter     rock-cutting efficiency    

Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM Article

Mingjiang Deng

Engineering 2018, Volume 4, Issue 1,   Pages 112-122 doi: 10.1016/j.eng.2017.07.001

Abstract: northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnelsAmong the tunnels constructed in the project, the Ka–Shuang tunnel, which is a single tunnel withThe main tunnel of the Ka–Shuang tunnel is divided into 18 tunnel-boring machine (TBM) sectionstechniques, intelligent tunneling techniques combined with the sensing and fusion of information about rock

Keywords: Super-long tunnels     Group construction by TBM     Risk management and control     Technical measures    

Crack evolution of soft–hard composite layered rock-like specimens with two fissures under uniaxial compression

Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 6,   Pages 1372-1389 doi: 10.1007/s11709-021-0772-2

Abstract: correlation were used to study the spatiotemporal evolution characteristics of crack extension of soft and hardcomposite laminated rock masses (SHCLRM) containing double fissures under uniaxial compression.The effects of different rock combination methods and prefabricated fissures with different orientationsHard layers predominantly produce tensile cracks; soft layers produce shear cracks.The first crack always sprouts at the tip or middle of prefabricated fractures in hard layers.

Keywords: soft−hard composite layered rock mass     double cracks     crack evolution     acoustic emission     digital image    

Influence of advanced engineering measures on displacement and stress field of surrounding rock in tunnels

Frontiers of Structural and Civil Engineering doi: 10.1007/s11709-023-0966-x

Abstract: and grouting modification using high-strength concrete-to resist fault dislocation in the surrounding rocknear tunnels crossing active strike-slip faults.Moreover, single- or multiple-joint advanced engineering measures form the local rock mass-anti-faultnear the tunnels crossing fault.The research results provide a new supporting idea for the surrounding rock of tunnels crossing active

Keywords: anti-fault effect     engineering measures     LRAF method     stress and displacement field     tunnel-crossing active faults    

Working Procedure of Developing a New Deep Hard-rock Burst-prone Deposit

Guo Ran,Yu Runcang

Strategic Study of CAE 2002, Volume 4, Issue 7,   Pages 51-55

Abstract: In this paper, the authors create a general working procedure to develop a new hard-rock burst-proneinto 6 steps: initial determination of burst tendency; study of the proneness to rockburst of typical rocksamples ;in-situ rock stress measurement; possibility of strain burst in the mine; principles in theThe above study results lays a theoretical foundation for applied research of deep hard-rock burst-prone

Keywords: rockburst     mining technique     working procedure    

The analysis of specific energy applied in Bohai Strait tunnel during TBM construction

Gao Pan,Zou Chong

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 73-79

Abstract: proposed Bohai Strait tunnel is a challenging project, and penetration rate of tunnel boring machine (TBMDuring the construction of the Clem Jones tunnel, researchers made the analysis and forecasted about the TBM

Keywords: TBM     specific energy     drilling rate index     penetration rate    

QPSO-ILF-ANN-based optimization of TBM control parameters considering tunneling energy efficiency

Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 1,   Pages 25-36 doi: 10.1007/s11709-022-0908-z

Abstract: However, the TBM control parameters set based on operator experience may not necessarily be suitableHence, a method to optimize TBM control parameters using an improved loss function-based artificial neuraltechnique, a custom artificial neural network (ANN) loss function based on the penetration rate and rock-breakingRock mass classes and tunneling parameters obtained in real time are used as the input of the QPSO-ILF-ANNthe TBM penetration rate by 14.85% and 13.71%, respectively, and reduces the rock-breaking specific

Keywords: tunnel boring machine     control parameter optimization     quantum particle swarm optimization     artificial neural network     tunneling energy efficiency    

Frontiers in Personless Mining and Avenues of Their Advancement in China

Li Zhongxue,Li Cuiping,Liu Shuangyue

Strategic Study of CAE 2007, Volume 9, Issue 11,   Pages 16-20

Abstract:

With the rapid social and economic development in China,  technology innovations in the extraction and utilization of mineral resources are demanded to address the problems associated with larger mining depth and other adverse conditions confronted by the mining industries,  increase the efficiency of extracting mineral resources,  and safeguard the safety and health of mining workers.  To this end,  the Chinese Ministry of Science and Technology (MOST) has launched a series of research directions through the 863 Program aimed at frontiers in the subject of personless mining to enhance technology innovations in personless mining and provide the mining industries with a fresh perspective to personless mining.  In response to the MOST initiative,  this paper presents a brief review on the development of automated mining technologies in the industrialized nations such as Canada,  Australia,  Finland and Sweden,  outlines the major technological issues on the frontiers of automated mining,  and proposes some avenues of advancing technology innovations in automated mining in China.

Keywords: hard-rock mining     automated mining     personless mining     personless mine    

Analysis of load and adaptability of disc cutters during shield tunneling in soft–hard varied strata

Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 4,   Pages 533-545 doi: 10.1007/s11709-023-0946-1

Abstract: disc cutters of shield machines exhibit unsatisfactory adaptability and performance during the soft–hardrotation state, cutting performance, and adaptability of disc cutters during shield tunneling in soft–hard

Keywords: shield tunneling     disc cutter load     laboratory excavation test     numerical calculation     soft–hard varied    

Advances in molecular dynamics simulation of ultra-precision machining of hard and brittle materials

Xiaoguang GUO,Qiang LI,Tao LIU,Renke KANG,Zhuji JIN,Dongming GUO

Frontiers of Mechanical Engineering 2017, Volume 12, Issue 1,   Pages 89-98 doi: 10.1007/s11465-017-0412-7

Abstract:

Hard and brittle materials, such as silicon, SiC, and optical glasses, are widely used in aerospaceHowever, these materials display poor machinability because of their hard and brittle properties.Damages such as surface micro-crack and subsurface damage often occur during machining of hard and brittleUltra-precision machining is widely used in processing hard and brittle materials to obtain nanoscaleprovides a review of present research on the molecular dynamics simulation of ultra-precision machining of hard

Keywords: MD simulation     ultra-precision machining     hard and brittle materials     machining mechanism     review    

Key Technologies and Applications of the Design and Manufacturing of Non-Circular TBMs

Jianbin Li

Engineering 2017, Volume 3, Issue 6,   Pages 905-914 doi: 10.1016/j.eng.2017.12.002

Abstract: and soil conditioning in loess strata for a rectangular pipe-jacking machine and a horseshoe-shaped TBM

Keywords: Non-circular TBMs     Rectangular pipe-jacking machine     Horseshoe-shaped TBM     Underground space exploitation    

Title Author Date Type Operation

The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction:

Shucai Li, Lichao Nie, Bin Liu

Journal Article

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnel

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Journal Article

A Closer Look at the Design of Cutterheads for Hard Rock Tunnel-Boring Machines

Jamal Rostami, Soo-Ho Chang

Journal Article

Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study

Journal Article

Field and laboratory experimental studies on hard-rock tunnel excavation based on disc cutter coupled

Journal Article

Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM

Mingjiang Deng

Journal Article

Crack evolution of soft–hard composite layered rock-like specimens with two fissures under uniaxial compression

Journal Article

Influence of advanced engineering measures on displacement and stress field of surrounding rock in tunnels

Journal Article

Working Procedure of Developing a New Deep Hard-rock Burst-prone Deposit

Guo Ran,Yu Runcang

Journal Article

The analysis of specific energy applied in Bohai Strait tunnel during TBM construction

Gao Pan,Zou Chong

Journal Article

QPSO-ILF-ANN-based optimization of TBM control parameters considering tunneling energy efficiency

Journal Article

Frontiers in Personless Mining and Avenues of Their Advancement in China

Li Zhongxue,Li Cuiping,Liu Shuangyue

Journal Article

Analysis of load and adaptability of disc cutters during shield tunneling in soft–hard varied strata

Journal Article

Advances in molecular dynamics simulation of ultra-precision machining of hard and brittle materials

Xiaoguang GUO,Qiang LI,Tao LIU,Renke KANG,Zhuji JIN,Dongming GUO

Journal Article

Key Technologies and Applications of the Design and Manufacturing of Non-Circular TBMs

Jianbin Li

Journal Article